Task force favors separate library, museum expansions

| | Comments (0)

A City Council-appointed task force assigned with revising Riverside's library-museum expansion plans issued its draft recommendation this week calling for separate expansions for both institutions. The recommendation, which would reverse the city's earlier combined expansion proposal, comes after several recent public meetings on the issue.


2006
Central Library

riv-2006-dt-museum-010-600.jpg
2006
Riverside Metropolitan Museum

riv-2007f-dt-museum-011a-450.jpg
2007
Museum exhibit

Most critics of the original $25 million proposal -- part of the city's Riverside Renaissance Initiative -- feared joint expansion would shortchange both entities. That plan called for an approximately 35,000 sq. ft. expansion: 9,500 sq. ft. children's section, 10,500 sq. ft. community/office space (with 250-seat auditorium) and up to 15,000 sq. ft. exhibition/flex space. Drawn up by Pfeiffer Partners Architects, Inc., the plan expanded outward in front of the current library, including displacement of the Chinese Memorial Pavilion.

Since then, several community members, residents and various civic groups have voiced opinions on the matter. The "Committee to Renew the Library" and "The Raincross Group" have both considered plans of their own, the latter recommending a 60,000 sq. ft. library expansion (basement plus two stories) in front of the current library (sparing the Chinese Pavilion); and, a 30,000 sq. ft. museum expansion (3 stories) behind the current museum. Estimates for both expansions are $38 million -- approximately $13 million more than the original joint-expansion project.

The task force's draft recommendation of separate expansions now moves ahead for a public hearing scheduled for June 18, after which a final task force meeting on June 25 will address any changes before forwarding the panel's final recommendation to the City Council (scheduled for August 12).

Whatever the final outcome, we agree both institutions should remain downtown at their current locations. Likewise, we'd prefer to see neither building's architecture severely compromised with any future expansions. Though many may say the current architecture of the library does not fit its immediate surroundings, we believe it has its own architectural merits (one, two, three) on which to stand, and thus, should not be significantly altered.

Related

Previous

Update



Leave a comment

advertisement



About this Entry

This page contains a single entry by gedward published on June 11, 2008 9:42 PM.

Arlington Branch Library reopens was the previous entry in this blog.

City Council approves portion of Fox Plaza is the next entry in this blog.

Find recent content on the RXSQ Main Index or look in the Master Archives to find all content.

Visit

advertisement







Planetizen

Planning news, announcements, and jobs - updated daily by PLANetizen

The Press-Enterprise

Local news updated daily by www.pe.com

Powered by Movable Type 4.1
version: 4.1

Site Navigation

  • RXSQ:

  • Main Index | Master Archives
  • Photo Galleries:

  • Downtown | City | Regional
  • Also:

  • Books of Interest

    Archives

    Tags

    Photos

    Photo Galleries
    Downtown | City

    Photo Pool
    www.flickr.com
    Raincross Square flickr photo pool View/add photos: Raincross Square photo pool

    Of Interest

    advertisement







    Local Links